Florida-based, US-operated. Inside the Homestead Air Reserve Base spaceport territory. AI-powered design pipeline, structural validation on every part, per-part traceability with engraved QR.
We're transparent about our trajectory. Phase 1 is non-DoD commercial work on the current Bambu P2S printer. Phase 2 brings TAA-compliant production online once the revenue trigger is hit.
Non-DoD commercial work on the current FDM platform. Building past-performance evidence, refining the parametric design pipeline, training the agent stack on real customer specs, and clocking GSA Schedule history.
Markforged Onyx One acquisition (US-made FDM, NDAA-2026 compliant) brings DoD-eligible printing online. Same parametric pipeline, same brand traceability, on US-origin equipment.
Parametric 3D-printed parts with an in-house software pipeline for design generation, structural validation, and traceable brand engraving on every part shipped.
Codes selected with Florida APEX Accelerator guidance. Engagements outside this list are evaluated case-by-case.
| NAICS | Title | Use case |
|---|---|---|
| 332710 | Machine Shops | Custom-machined fixtures and jigs (when CNC partner active) |
| 332999 | All Other Misc. Fabricated Metal Product Mfg. | Brackets, mounts, hardware (printed + machined hybrid) |
| 333995 | Fluid Power Cylinder & Actuator Mfg. | Hydraulic / pneumatic test fixtures and adapters |
| 336411 | Aircraft Manufacturing | Non-flight fixtures, ground support equipment, tooling |
| 336415 | Guided Missile & Space Vehicle Propulsion Unit Mfg. | Tooling and ground-support hardware (not flight components) |
| 541713 | R&D in Nanotechnology | SBIR / STTR pre-commercial R&D in additive process control |
Honest posture, no overclaiming. Compliance is built incrementally with revenue — we don't pre-spend on certifications until a contract justifies them.
Practices in place: credential isolation, daily port-hygiene scans, daily breach watch, daily LAN-inventory diff, segregated WireGuard tunnel for public-facing services.
Submitted. UEI and CAGE codes pending activation. Florida APEX Accelerator (Miami-Dade) advising the registration package.
Phase 2: Markforged Onyx One acquisition once $25K cumulative commercial revenue is reached. US-made FDM, NDAA-2026 compliant, ITAR-eligible workflow.
Quality manual v1 drafted. Full AS9100D certification scheduled post first qualifying contract; budget $25K–$35K over a 3-year cert cycle.
No USML-controlled work undertaken to date. DDTC registration deferred until first ITAR-scoped award. Workflow segregation already in place to support eligibility.
Current Bambu P2S is non-US-origin equipment. DoD direct work is out of scope on this platform. Phase 1 is limited to commercial / civilian aerospace / non-DoD work. Phase 2 platform brings full DoD eligibility.
Explicit "3D Printing Solutions" line. Eligibility requires 2 years operating history plus commercial sales record. Building the prerequisite now — every commercial engagement clocks the GSA timer.
Account in setup. Entry-level pipeline for small-parts opportunities — many awards go to small businesses without prior relationships. Targeting non-flight-critical fixtures and ground-support hardware first.
35 active parametric designs across calibration, printer-accessory, copy-stand, and panel-mount categories. Documented iteration cycles. Public catalog updated continuously.
Three-revision iteration cycle (v1 → v2 → v3) documenting fit refinement against a known target. Lessons codified into the parametric library.
Material-efficiency redesign: 136g → 55g, 370min → 148min. Tighter walls, ribbed floor, watertight, branded. Demonstrates engineering KB applied to mass reduction.
Photo-calibration fixture used across the portfolio for dimensional verification. Locks the photo-to-millimeter pipeline used on every shipped part.
Full 35-design portfolio available in the Past Performance Portfolio PDF. Browse the live catalog →
APEX Accelerators (formerly PTACs) provide free government-contracting consulting to small businesses. We work with the Miami-Dade office on registration, set-asides, and prime introductions.
No-cost guidance on SAM.gov entity registration, NAICS selection, HUBZone eligibility, capability statement review, and warm introductions to prime supplier diversity offices.
Florida APEX is co-funded by the Department of Defense and FIU — independent advisory, not a paid promoter relationship. Their guidance is documented in our SAM.gov walkthrough and registration package.
The standard small-business contracting leave-behind set. English and Spanish capability statements available; CMMC L1 evidence pack is gated behind NDA.
We respond to capability inquiries within 48 hours. Ask for the EN or ES capability statement, request an NDA for evidence-pack access, or send an RFQ — we'll match it against our parametric library and quote within two business days.
Request capability statement →